*1 In the STC environment, The rated power of the module shall not exceed 1.05 times of the optimizer rated input power.
*2 The power optimizer has the output voltage equal to or less than its input voltage, being the output voltage of the PV module it connects to. Referto AS/NZS 5033:2021 Clause 4.2.1.2 for the calculation of VMOD MAX.
*3Power optimizer is bypassed in the string connected to an operating inverter when it fails to work.
*4 Power optimizer output 0Vdc when disconnecting to the inverter or inverter is shutdown.
*5 Allow PV module frame installation / extruded aluminum profile installation.
*6 Fits PV module in landscape and portrait installation.
*7. Require standard 60 cells module to meet the inverter minimum startup voltage
*8 Full power capability refers to online smart design tool.
There are no reviews yet.